Ravensthorpe Nickel Mine
COMPLETION: 2011
TONNAGE: 650T
DESCRIPTION: Redevelopment of the Ravensthorpe Nickel Mine
SCOPE: Cays’ original scope comprised of the supply, fabrication, surface treatment and delivery to Ravensthorpe of approximately 200 tonnes of structural steel and conveyor frames for the Limonite and Saprolite crushing plants. Cays were awarded additional areas such as the product screening, buffer pond walkways and pipe racks, conveyor take-up frames and numerous extensions to existing areas of the plant.
Outloading Steel
COMPLETION: 2012
TONNAGE: 500T
SCOPE: Project Management, supply, fabrication, surface treatment and assembly of structural steel,
chutes, conveyor frames, hand railing, grating and stairs.
DESCRIPTION: Development of Port Facilities including a second and third out loading and in loading circuit.
Belt Reelers
COMPLETION: 2011
DESCRIPTION: VSD driven Belt Reelers
SCOPE: Project Management, supply, fabrication, surface treatment and assembly of Belt Reelers
Feed Preparation Screen Underpan
COMPLETION: 2012
TONNAGE: 18T
SCOPE: Fabricate, surface treat and rubber line a feed preparation screen underpan.
DESCRIPTION: The supply of screen underpans to be used gas routable spares.