Ravensthorpe Nickel Mine

COMPLETION: 2011

TONNAGE: 650T

DESCRIPTION: Redevelopment of the Ravensthorpe Nickel Mine

SCOPE: Cays’ original scope comprised of the supply, fabrication, surface treatment and delivery to Ravensthorpe of approximately 200 tonnes of structural steel and conveyor frames for the Limonite and Saprolite crushing plants. Cays were awarded additional areas such as the product screening, buffer pond walkways and pipe racks, conveyor take-up frames and numerous extensions to existing areas of the plant.

Outloading Steel

COMPLETION: 2012

TONNAGE: 500T

SCOPE: Project Management, supply, fabrication, surface treatment and assembly of structural steel,
chutes, conveyor frames, hand railing, grating and stairs.

DESCRIPTION: Development of Port Facilities including a second and third out loading and in loading circuit.

Belt Reelers

COMPLETION: 2011

DESCRIPTION: VSD driven Belt Reelers

SCOPE: Project Management, supply, fabrication, surface treatment and assembly of Belt Reelers

Feed Preparation Screen Underpan

COMPLETION: 2012

TONNAGE: 18T

SCOPE: Fabricate, surface treat and rubber line a feed preparation screen underpan.

DESCRIPTION: The supply of screen underpans to be used gas routable spares.

Previous
Previous

More Commercial Projects